Below are some Frequently Asked Questions regarding transporting overdimensional loads across the Queensland Rail network. The Overdimensional Loads team can also be contacted on 07 3235 1719, or emailed at road.loads@qr.com.au

When do I need to obtain permission from Queensland Rail to travel?

You must have the necessary authority when the load exceeds legislative requirements set down in the Transport Infrastructure (Rail) Regulation 2006. A summary of these requirements can be found at overdimensional loads overview. For more details, refer to the Transport Infrastructure (Rail) Regulation 2006 available on the Office of the Queensland Parliamentary Counsel web site.

Why do I need a permit?

A permit is an authority to travel, under specific conditions, and is issued to manage adverse affects on Queensland Rail’s rail network. A permit is a legislative requirement, and it is important to ensure the safety of all people involved in the transportation of over dimensional road loads, Queensland Rail staff and the general public.

A permit also ensures that all Queensland Rail network infrastructure is protected from potential damage and that the police are informed of Queensland Rail network requirements. Police must check the permit before travel.

Why do I need a confirmation?

A confirmation is authority to travel without added restrictions from QR Network. It is a requirement of the Queensland Police that Over-dimensional road loads are checked for dimension and route by Queensland Rail before travelling.

The police require all over-dimensional road loads to have a confirmation from Queensland Rail even when it does not travel over Queensland Rail infrastructure.

There is no charge for a confirmation.

What is the application fee?

The fee varies, depending on the over dimensional road load and complexity of the application. A list of the relevant fees can be found at Overdimensional loads charges.

Is there an additional fee if I change the details on my application?

You may have to pay an additional permit fee to cover the extra work required to process the change requested. An additional permit fee may apply if the following changes are made outside of the relevant time frames specified by Queensland Rail:

  • a change of route;
  • a change of date; or
  • change of dimensions.

A list of the relevant fees can be found at Overdimensional loads charges.

When I have a change of details, do I have to send a whole new application?

No. You simply put a line through the original information that you want to change and write the new information next to or directly above the obsolete information; then re-fax the application.

How much notice does Queensland Rail require?

The applicable Application Form sets out how much notification must be received by Queensland Rail before the transportation of an over-dimensional road load on Queensland Rail infrastructure. Depending on the type of load that is being transported, different requirements need to be met.

What happens if I don’t obtain an authority?

You may incur penalty units under the Transport Infrastructure (Rail) Regulation 2006 and be liable for any damages to Queensland Rail network infrastructure.

Please note that a permit or confirmation does not prevent liability including damage to Queensland Rail property and personal injury to any person.

Police escorts should not allow the move to proceed without a written Queensland Rail permit or confirmation to cross the rail infrastructure.

Why must I list overbridge and open level crossings in the application?

This allows routes to be checked in order to ensure the safety of both Queensland Rail's infrastructure and all concerned parties.

Why must I list the time that the over dimensional road load will cross an open level crossing?

Queensland Rail requires an estimated time so we can:

  • inform our Train Control to ensure the safe passage of any trains
  • allocate staff at the correct times (if required)
  • avoid incidents involving trains and rail mounted vehicles that can use the track at anytime.

How do I apply for permission?

Apply to move an over-dimensional road load through Queensland Rail's Over Dimensional Road Loads Division.

What should I do if I haven't received a permit or confirmation from Queensland Rail?

If you have not received a permit or confirmation by 10 am four working days prior to the move, it is important to call Queensland Rail on 07 3235 1719 as soon as possible. If you do not contact Queensland Rail your move on the required date may be in jeopardy.

 
General Enquiries:

For Queensland Rail information please call:

P:

13 16 17 (within Australia)

0061 7 3072 2222 (outside Australia)

(7.15am - 5.30pm EST; Mon-Fri)

E:

Feedback Form

 
In case of emergency:
Call 000
Mobile | Right to Information | Peak On-Time Results | Copyright | Disclaimer | Privacy | Linking Policy | Site Map Queensland Rail    ABN 68598 268 528   ACN 132 181 090   Travel Agent License 3274957